Johnson Hall Floor Assembly
Since the install of the structural steel members, LVL beams are being placed as the first component of the floor assembly. LVL’s,
Since the install of the structural steel members, LVL beams are being placed as the first component of the floor assembly. LVL’s,
CV Metal Services and Ganneston Construction installing structural steel at the third floor It was discovered that the existing carrying
At the front corner of Johnson Hall's historic 1864 building, where what used to be the storage room, the space for the
Sharing with you - a look between the 2nd and the 3rd floors With more demo taking place, the stairs from the
As we progress with the renovation, peeling back layers and peeking behind things, amazing discoveries are happening! If you walk by, you
The third floor floor boards have come up and a local Gardiner based business, Barn Boards and More, is salvaging the boards.
If you walk by Johnson Hall, you may hear the work being done, but not see it. Take a look through the
Friday, April 8th was a big day at Johnson Hall! After years of fundraising, we celebrated that the interior construction will begin
With warmer weather, work has begun again for the exterior historic preservation of Johnson Hall Ganneston Construction has returned, with work being
As the weather turned colder, construction on the exterior of Johnson Hall continued. Until it could continue no more. The scaffolding has
©Copyright 2019-2024, Johnson Hall Opera House. All Rights Reserved.
Johnson Hall Opera House is a 501(c)(3) nonprofit located in Gardiner, Maine. Our mission is to promote, create, and inspire artistic excellence through the presentation of world-class entertainment and professional performing arts education, and to drive cultural and economic growth for our community.
(207) 582-7144
PO Box 777
Gardiner, ME 04345
280 Water St.
Gardiner, ME 04345