On Monday, September 12th, crews installed the steel beams needed for the balcony. The beams were lifted by a huge crane and inserted through a hole on the park side of Johnson Hall. Take a look!
On Monday, September 12th, crews installed the steel beams needed for the balcony. The beams were lifted by a huge crane and inserted through a hole on the park side of Johnson Hall. Take a look!